MINUTES
OF THE LAUREN BOARD OF DIRECTORS MEETING The
meeting was called to order at The
Board approved the March minutes as a true record of that meeting. About
$62,000 has been spent from the operating account on capital reserve items.
The board approved the transfer of capital reserves to operating account
to cover this. This is a normal
process. For the benefit of
first time attendees, the board discussed the funding of and relationships
between the operating fund, the unrestricted capital reserve fund, and the
restricted HVAC fund, and explained how transfers are made. 2009
Audit The
Board had already approved the audit and noted it will be available at the
annual meeting. The
Board also noted that one of the major financial issues ahead is the auditor’s
recommendation that we consider changing our accounting system from a modified
accrual system to either a straight cash or straight accrual system. They noted
that any change would have to consider the accounting capabilities of our
financial management firm. ACTION ITEMS N Street Brick Facade
Repairs In
late afternoon on The
good news is that the damage can be immediately repaired for about $5,000 and
remediation is scheduled to start April 23. However, the consulting engineer’s
preliminary report recommends that the Lauren put in angle iron supports on each
floor immediately for the damaged tier. The cost would be about $20,000. The
engineering company is preparing a report on the most optimal, cost effective
approach for the rest of the building. The recommendation should be
received by April 24. Assuming that
the recommendation is for two tiers or about $40,000, the board would approve
the installation on two tiers, and the next Board can decide the longer term
solution. Because of the project's potentially high cost, the Board asked the President to ensure that owners know about the situation. COMMITTEE REPORTS Decorating Committee Dwight
Clark and John Filice reported on the progress of the hallway redecoration
program. The second elevator is expected to be completed by the first week
of May. All signs are up and look great. Reader panels will be installed in the
front of the elevator aligned with the top of the control panel. Landscape Committee Elizabeth
VanderPutten and John Filice reported that their objective was to make the
Lauren landscaping beautiful, uncluttered, and low maintenance. The Board
commended the new landscaping and the work done by Cacho.
Annual Meeting
Planning The
meeting will be at the Marriott Hotel on 22nd and M Streets at Driveway Safety-
Flashing Light(s) A
flashing light at the top of the driveway to warn pedestrians of a vehicle
exiting the building will be installed shortly. Spotlights on
Interior Hallway of Pool House Level Photovoltaic
switches will be installed shortly to reduce the consumption of energy by
automatically turning off the lights during the day.
The Board discussed the idea of a motion detector, but agreed that these
would not work for several technical reasons. FHA Approval-Update
on Status Because
the building is only 45% owner occupied, it is unlikely that the Lauren will get
FHA approval, but our application is pending. Lease and Move-In
Paperwork-Review Existing Policies The
Lauren is a residential building. The Board is sensitive to the needs and
desires of residents to enjoy their homes in relative peace and quiet. Move-ins
and move-outs are inherently disruptive. Lauren policies try to accommodate
movers’ needs and residents’ rights. Moves,
therefore, are not allowed on Sunday except if religious reasons prevent moving
on Saturday. Similarly, moves are
not allowed in the evening. There is a $40 per hour fee for moving during other
hours. Lauren
policy requires that before anyone moves into the building a signed lease with
the approved lease addendum must be submitted to management or a fine of $50 a
week up to $200 a month will be levied. The
manager will ensure that anyone scheduling a move-in without the appropriate
lease is fully informed of this policy on fines.
Delivery/Moving
Policies In order to protect the newly redecorated elevators from unnecessary damage, the Board urges all owners and tenants to let the Lauren staff know in advance if they are having large deliveries and to arrange these deliveries to the extent possible during weekdays. In addition to reducing inconvenience to residents on weekends, maintenance staff members are available during weekdays to install elevator pads. Under unusual circumstances large items must be delivered on weekends. In those cases, residents are asked to notify management as much in advance as possible so arrangements can be made to protect the elevators. If a delivery is made without prior notification, desk staff will work with the residents to hang the elevator pads if needed. All large deliveries must be made through the South or North doors and not through the lobby. Roof Garden Furniture The
roof garden lounge chairs and tables have been cleaned.
Three reclining chairs are beyond repair and will be discarded. The Board
asked the manager to get brochures on replacements for the eight-year-old grill. Request for Board to
Reconsider Regulations about Dogs to Allow Intermittent Stay(s) The
Board declined the request by an owner for permission to have a dog on a limited
basis, and to receive a waiver of condominium regulations that forbid dog
ownership. The Condominium has since
its inception forbidden ownership of dogs, with the exception of service dogs. Request for Board
Members' Contact Information The
Board asked the manager to make sure that the desk staff has the phone number
for each board member in case of emergency. Printed material or hard-copy
messages may be left at the front desk for any member of the Board, or the
manager. Owners wishing to contact the board can make inquiries through the
manager. The Board can also be reached at thelauren@juno.com. Additional Water
Heater The
Board discussed the possibility of installing a fourth water heater. The current
system functions satisfactorily except in very cold weather. The cost would be
about $20,000. The Board postponed the decision until the cost of repairing the
brick façade is known. Smoking Smoking
continues to be a contentious issue in The Lauren, and has been discussed at
innumerable Board meetings as well as at several annual meetings. The Board
acted on a motion to have the president write to each individual owner asking
that a no-smoking clause be added to any lease. Pool Opening The
Board approved the pool contract. The
pool is scheduled to be repainted, then opened by May 15. Sprinkler
and Alarm System The
Board authorized $1,862 to Castle to repair fire protection system required as a
result of a recent inspection of the sprinkler and alarm system. In-Unit Renovations There
is a stop work order for reconstruction in unit 112 and 113 until plans are
approved. NEW BUSINESS Anonymous Mailing and
Handout Material Unit
owner Stan Caron commented that the building has only improved since he moved
here in 2005. He thanked the Board and the manager for their diligent service. Mr. Caron stated he was offended by receiving an unsigned letter with an alternate proxy to the one sent by the Board President. He said he felt deceived. He felt the intent was to mislead the owners. He asked the Board to reject any of these alternate proxies. However, the president explained that, through the advice of the Lauren attorney, it would be required to accept alternate, legally signed proxies. Owner Wayne Rhee, whose name was listed on the alternate proxy, said he was not consulted and did not see the mailing and alternate proxy before it was sent. Although he shares some of the concerns cited, he reported that he interviewed many Lauren staff and residents about these issues, and he concluded that the current board is managing the issues well. He expressed support for and confidence in the current Board. NEXT REGULAR BOARD
MEETING The
next meeting will be the annual meeting at the Marriott Hotel on 21st and M
Streets on Thursday, May 6, at ADJOURNMENT
The
meeting was adjourned at EXECUTIVE SESSION
The
Board met in executive session. RESPECTFULLY
SUBMITTED Elizabeth
A. VanderPutten, Secretary TREASURER’S
REPORT: Month
Ending March 2010 A.
Total
Owners Equity / Net Cash Available Total
owners equity / Net cash available at the end of March 2010 was $
1,105,855.95 1.
Fund
Balances as of the end of March 2010 a.
Operating
cash balance as of the end of March 2010: $ 35,392.23 b.
Reserve
Funds: b.1)
Unrestricted capital reserves:
$ 717,873.31 b.2)
HVAC dedicated replacement reserve
fund booked balance:
$ 371,984.16
Total
Reserves
$ 1,089,857.47 Note
1 re Reserve Funds: ·
General
Reserves for 2010 = $14,083.33 per month ·
Restricted
HVAC Reserves for 2010 = $8552.52 per month Note
2 re Reserve Funds: B.
Year-to-date operations, through the end of March 2010:
C.
Other Treasurer Reports 2.
Laundry
Income: a.
March
coin deposits
$ 869.50 b.
March
“Net” Credit Card Income per Global Statement:
$ 1,465.39 Total
laundry income March 2010
$
2,334,89
NOTE:
· Coin
collection and deposit covering period 02/25/10-03/26/10 performed 03/26/10 and
will be shown on April 2010 financial statement. 3.
2009
Audit: ·
First
draft accepted at March Board meeting, with request for incidental clarification
from auditor. Representation letter signed by Treasurer and Managing Agent and
returned. 4.
CD
Activity with Smith Barney ·
Smith
Barney has been successfully conducting electronic transfers of our monthly
reserve contributions to the respective reserve accounts…General
Reserves & Restricted HVAC Reserves. ·
Treasurer
and Property Manager have reviewed the monthly Smith Barney statement of account
for The Lauren Condominium reserves and have determined it to be accurate.
Interested owners are free to request a copy from our Property Manager in
writing. CD purchases / activity during the month are reflected in the monthly
statement. ·
The
Treasurer and Property Manager discuss the following with Smith Barney on a
regular basis: a) Current money
market funds; b) CD Maturing Dates d) Non Smith Barney CDs to be moved into our
Smith Barney account. ·
Remaining
CD’s to be transferred to Smith Barney upon maturity: 5. WA
First Bank: Matures 7/24/10 (5.25%)
$ 77,735.79 Capital
Expenditures
·
Interiors:
Approximately $ 25,000 to $ 30,000 more in capital expenses remains to cover
contractor and interior design fees for interior renovations that were begun in
2009. ·
Southern
façade repair pending investigation by Seal Engineering….Cost to be
determined. - END