The Lauren, A
Condominium
TO: Residents of the 10th floor The Lauren's engineer, Wayne Hall of Environmental Systems, has developed a format which will allow the system to be assessed with minimal impact on residents. Specifically, the closed loop water temperatures of the top (10th) floor of all tiers (1 through 17) will be taken and recorded. This test will require that the grill of your convector be removed, a reading taken, and the grill replaced. The entire process should take about 15 minutes per unit. It will be performed by Lauren maintenance (Cacho), with assistance as necessary from other Lauren staff. |
|