An independent engineer conducted a study in 2000 to estimate the remaining useful lives and the replacement costs of the components of common property. Replacement costs were based on the estimated costs to repair or replace the common property components at the date of the study. Estimated current replacement costs have not been revised since that date and do not take into account the effects of inflation between the date of the study and the date that the components will require repair or replacement.

The following information is based on the 2000 study and presents significant information about the components of common property. The study was updated in 2003.

 

Estimated
Remaining
Useful

Estimated
Current
Replacement

Component
of Fund
Balance

Components

Life (Years)

Cost

12/31/2003

Exterior Building Replacement

 

 

 

Asphalt replacement

10

$   12,925

$   10,682

Awning, front entrance

10

11,000

9,091

Brick, tuck pointing

1

116,620

96,391

Chain link fence

1

2,160

1,786

Concrete flatwork

2

5,945

4,911

Concrete ramp and elevator (ADA)

30-50

37,249

(57,516)

Deck, wood and carpet, roof with metal railing

10-20

61,800

(51,189)

Gate and operator, parking lot

18

4,500

3,720

Light fixtures, exterior

2

1,650

1,364

Pool mechanicals, painting

1-3

5,910

4,885

Roof

20

136,350

(180,120)

Sealants, partial replacements

1

56,550

46,738

Windows, common areas

12

31,290

(21,139)

(Continued)

Page 14


 

THE LAUREN, A CONDOMINIUM

Supplementary Information on Future Major Repairs & Replacements (Continued) December 31, 2003

(Unaudited)

 

Estimated
Remaining
Useful

Estimated
Current
Replacement

Component
of Fund
Balance

Components

Life (Years)

Cost

12/31/2003

Interior Building Elements

 

 

 

Apartment, renovations

3

$   7,500

$   6,199

Appliances, laundry room, apartment and offices

 

16,500

13,637

Bathrooms, renovations

 

10,200

8,430

Doors, internal and external

11

42,000

34,712

Garage

1-7

116,725

96,470

Hallway renovations

2

63,600

52,564

Lights

15

14,950

12,357

Lobby renovations

11

35,150

25,750

Mail boxes

1

21,400

17,686

Offices, renovations

6

13,650

8,985

Painting, stairwells

1

7,800

(2,146)

Building Systems

 

 

 

Air handler

9

10,500

3,648

Boilers, replace existing

1

105,600

69,190

Cooling tower, replacement

14

65,000

50,700

Electrical wiring, invasive study

1

25,200

14,727

Elevators, upgrade

7

120,000

99,177

Fan coil unit convector pans

1

16,800

4,638

Fire alarm system, upgrade

1

35,000

28,926

Interphone system

1

10,250

8,472

Pumps, trash compactor, condensers and fans

4

34,200

25,632

Riser sections, partial replacements

10

87,000

14,840

Security system, upgrade

4

18,900

15,619

Trash chute and doors

15

31,350

25,909

Waterheaters and storage tanks

6

44,600

26,346

Reserve study update with site visit

2

3,750

698

Total

 

$   1,441,574

$   532,770